Project Update: Artex Ltd’s Biomass Install

Project Update: Artex Ltd’s Biomass Boiler Install
The project features two ETA Hack 500 kW biomass boilers, designed to provide efficient and sustainable heating. As part of the upgrade, a new plant room has been constructed, complete with a 25,000-litre buffer vessel.
The scope of work includes the delivery and installation of both boilers. All pipework has been completed, connecting the boilers to the buffer vessel and preparing for future external connections. Additionally, all electrical work has been carried out, including containment within the plant room for safety and compliance.
Finally, the flue system has been installed for both boilers, ensuring safe and effective ventilation. This comprehensive installation ensures the system is fully operational, efficient, and ready to provide reliable heat.